The road ends here. This is the highest tonnage you’ll get from an automated spool welding cell
The Rotoweld 3.0 Twin Bay HD has been designed for large projects like LNG plants and refineries that need to be built in record time.
diameter capacity
pipe stands capacity
daily productivity capacity
Gives you:
Let our specialist find the right models to suit your production flow and specific needs. In less than a week you’ll have all you need to make your purchase decision.
The Tecnar factory releases a new Rotoweld every 3 weeks. Based on demand, the average delivery time is between 3 and 9 weeks. Be sure to get in line.
A Rotoweld specialist will complete the installation in 2 days and train your entire team for 3 days so you can optimize the performance of your Rotoweld.
Carbon steel (including A333 Gr. 6)
Stainless steel (304,316 and similar
Cr-Mo steel alloys
Duplex stainless steel
Root pass
GMAW (short circuit)
Fill pass
GMAW (spray or pulsed transfer)
SAW (submerged arc)
Fill pass option
FCAW (flux core)
Diameter capacity
75 mm to 1,219 mm
3 in. to 48 in.
Centre line clearance to ground
1,803 mm
71 in.
Operation speed range
0,2 à 1,9 rpm
0,2 à 1,9 rpm
Maximum torque
5,649 n-m
50,000 lbs.-in.
Load capacity
1 360 kg
3 000 lb.
9,072 kg
20,000 lbs.
Width
2.3 m
7.5 ft.
Height
3.5 m
11.5 ft.
Length
19.5 or 24.4 m
64 ft. or 80 ft.
Root pass - STT
Lincoln Power Wave® S500
Fill Pass - GMAW
Lincoln Power Wave® S500
Fill Pass - SAW
Lincoln Flextec 650
Leave your details so our experts can contact you.