One of the largest Saudi Arabian EPC companies in the Oil & Gas industry is utilizing the Rotoweld 3.0 PerfectPass-iQ for its Zuluf project, which involves the production of approximately 1 million dia in of pipe spools.
Discover how Way Engineering uses two Rotoweld 3.0 systems in a face-to-face Twin Bay setup! Watch their installation in action and see the efficiency in motion.
Watch the timelapse of the Rotoweld 3.0 performing 5 welds in less than 45 minutes, including pipe set-up and transition time between welds, leading to a 93% arc-on time.
Typical Rotoweld timelapse commissioning with our Rotoweld experts on site.
Rotoweld 3.0 performing a 10″ SCH 40 during the root pass.
Rotoweld 3.0 respecting the typical welding times of 1 min/dia inch. for a standard wall.
In a typical commissioning week, our Rotoweld specialists will complete the installation in 2 days and train your future operator in 3 days.
With our Rotoweld 3.0, it only takes 98 seconds to complete a full weld on a 4-in. DIA, 3 mm thick stainless steel pipe. In this in-house demonstration, our Rotoweld expert, Martin, is using TRIMIX 90%He/7.5%Ar/2.5Co2 gas and back purging with pure argon.